Completed Projects
Current Projects
 
 
By Category :
By Completed Year :
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] 
  Project Description
Completion
Date
Electrified Double Track Project between Rawang and Ipoh, Bridge Works Package.
Jun 2006
The Design, Construction and Commissioning of a New Railway Halt at KM 375.800 between Sg. Buloh and Kepong Stations.
Jun 2006
Greater Ipoh Water Supply Scheme II, Construction of Sg. Kinta Dam and Associated Works - Sub-contract Works of Raw Water Pipe Line, Earthworks & Placement of RCC
May 2006
Rehabilitation of Old Bertam Treatment Works. (M & E Works Including Instrumentation & SCADA Works)
2006
VORSEP TAS900 Single Tube Dust Collection System for a 45 t/h, Oil Palm Fibre/Shell Fired Boilers
2006
Construction and Completion of Water Reservoirs WR4 & WR6, Suction Tank & Pump House including Water Pipeline in Precincts 5,6,15 and 19 for Putrajaya Federal Government Administrative Centre, (Package WS9)
Dec 2005
Construction and Completion of Wastewater System including Pump Station (PS12) in Precinct 18 at the Putrajaya Federal Government Admin. Centre (Package WWF2A)
Sep 2005
Construction and Completion of Bridge over ERL Railway connecting Precinct 7 to West Transportation Terminal at Precinct 7, Putrajaya Federal Territory
Feb 2005
BIORID BHS-003-G Odour Control System for Sewage Treatment Plant.
2005
Construction of Treatment Plant, Sri Gading, Stage 2 (Package 2) - Supply and installation of Water Treatment Plant and associated works.
2005
Design, construction and upgrading of Kg Putih Water Treatment Plant, Kota Bahru, Kelantan.
2005
Merbau Chondong Water Supply Scheme Phase 1, Machang, Kelantan. Design, supply, install, test, commission and maintenance of process system, SCADA system, instrument, Telemetry, building services work & all associated M&E works
2005
Design, Construct, Equip, Complete, Commission and Maintenance of Main Infra-structure Works & Satelite Works for Additional Campus of University of Mara Technology Mukim Jeram - Prefix Works Phase 1 comprising Construction and Completion of Roadwork and Surface Water Drainage, Street Lighting & Landscaping Works at Access Road No. 2 (Package 4)
Nov 2004
Design, Construct, Equip, Complete, Commission and Maintenance of Main Infra-structure Works & Satelite Works for Additional Campus of University of Mara Technology, Mukim Jeram, Kuala Selangor District, Selangor - Prefix Works Phase 1 comprising Site Preparation Works, Erosion & Sedimentation Control Plan and Access Road No. 2
Nov 2004
Indah Water Capital Works: Georgetown Priority Sewerage Scheme - Pulau Pinang Upgrading of PS16 Pumping Station, Georgetown, Penang
Jun 2004
 
   
 
       
Important legal information - please read the Privacy Policy & Disclaimer before proceeding.
Copyright © 2005 - 2010 Loh & Loh Corporation Berhad. All Rights Reserved.